We specialize in the Design, Construction and Construction Management of Residential, Commercial and Medium rise Buildings.
To get started, you can avail of our Conceptual Design Package, enabling us to complete the design and budget for your project. The payment of which is deductible from the construction cost should the project be awarded to us.
Our process starts with site visit, floor plan, perspective, other details and costing. We keep clients informed at every step.
Yes, we specialize in creating custom home designs tailored to your lifestyle, preferences, and site requirements.
Average construction cost typically range from ₱20,000 to ₱55,000 per square meter. This variation depends on several factors, including the location, condition of the lot, complexity of the design, room sizes, number of bathrooms, and the types of finishes chosen.
Yes! We provide free loan application assistance to a number of our affiliate banks.
In basic construction materials, St. Vincent Builders only specifies top-of-the-line brands. For finishing materials, the owner will be the one to choose what kind of finishes he wants to use with the assistance of our architect.
All necessary paperwork and procedures for the building permit application are handled by the company, including coordination with local authorities. However, bonds and subdivision fees are to be settled by the client. For water and electricity applications, the company manages all site coordination and groundwork, while payment of corresponding charges remains under the client’s responsibility.
The project cost is initially assessed through the Conceptual Design Package. Design plans are developed based on the client’s specific requirements, after which a detailed cost estimate is prepared. If the initial estimate goes beyond the target budget, necessary revisions to the design and costing are made until both align with the desired specifications and budget range.
Upon approval of the final design and cost estimate, the process proceeds to contract signing. A 10% down payment is required to initiate building permit processing. After the permit is released, a 20% down payment is made before the start of construction. The remaining balance is paid through progress billings, based on actual work accomplished on site.